I started tiling our bathroom last week. I set the floor tile on Wednesday night and grouted it on Friday. Let me just say for the record, that grout is a wonderful thing. It makes a not so hot tile job look pretty darn good. On Saturday I put up the rest of the dura rock (minus one side of the tub that I was still clamping and gluing) and started on the wall tile. My stepdad and father in law both stopped by Saturday night and helped with all the wall tile. It was a huge help too. I never could have gotten so much done without them. I ended up getting close to half the bathroom done, and we are getting very close to being able to shower. We can hardly wait!