Lucy Ave - Finishing Touches

 A264929A lot got done Friday! We had plumbers and metal workers at the house all day long. They are both nearly done and will both be back on monday to finish up. Tuesday we have our final inspection. Premier Metal Works did an awesome job fabricating our railings for the stairs, porches and roof top patios. They have been working hard to get their job wrapped up in time for our final inspection. The guys at In-Line Plumbing worked all day today getting our finish plumbing done. We got all of our appliances installed today as well. We are very happy with the appliances we chose. We went with the Jenn Air "Pro Style" series. We were lucky to get a fantastic price on them. We would not have been able to afford them otherwise. Our kitchen is nearly done and it is turning out pretty much as planned. The Ikea cabinetry is the "Abstrakt" series. They are a high-gloss white finish. The blue pictured here is just a protective film that we will remove once construction is complete. We would not have stayed within budget without Ikea in town. Our total kitchen cost including appliances is under 10k! The house should be ready for us to move in by the end of next week! -Jacob

 A264928  A264926  A264924