The walls are going up

Dsc 0013-10Benchmark Renovation is in charge of doing all the framing and siding. Yesterday they had three guys at our house, and they started framing up all the walls. They pretty much got all the walls up except the connecting corridor. The picture above is from the corner of the patio looking at our bedroom. The big opening is where the 8' slider goes. You can also see where all the windows will go to the right of the sliding door.It's really crazy to actually see it with walls up. No matter how good a drawing is, it's hard to really visualize what the space is going to feel like.