The floor is in

Dsc 0016-11After much preparation we finally got our floor poured yesterday. For a while I almost thought we weren't going to make it. There were some last little things I had to get done with the radiant tubing, and I had forgotten that I had to get a mechanical permit for the radiant system as well. When the inspector came by on Tuesday, he pointed out these short comings and said we had to fix them before we could pour. I scrambled Tuesday to get a permit, and finished up the radiant at 10:00 that night. The weather was beautiful yesterday, and it was our one window before it starts to get snowy again. The crew from Savage Construction put in a long day, and did a beautiful job. They ended up power troweling the house section, and hand finishing it until it was super smooth. I bought them all dinner while they waited for the last section to cure enough to finish it, and it was after 7:00 at night before they got out of here. Today they will seal it well and get it covered before the snow storm tomorrow. Next week we should hopefully start framing our house up. Dsc 0019-8